DELIVERY & SITE PREPARATION
Everything you need to prepare your land for a smooth installation
Delivery Methods

Tilt Tray Truck
Tilt Tray Truck (Standard Delivery)
✔ Best for 20ft units
✔ Requires straight access
✔ Drops the home directly on your prepared site
✔ Fastest and cheapest method
Required space:
-
Minimum width: 3.2m
-
Minimum height: 4.0m
-
Turning space for truck (15m recommended)
Crane Truck (For Tight Spaces or 40ft Units)
Best for 30ft and 40ft models
✔ Can lift over fences, trees, obstacles
✔ Higher accuracy for positioning the home
Crane lift range:
-
Standard reach: 6–12m
-
Larger cranes available for special sites

1. Site Access Requirements
To ensure smooth delivery, please check the access before booking:
✔ Access Width
-
Minimum: 3.2 metres
-
Ideal: 3.5–4m
✔ Access Height
-
Minimum: 4.0 metres (for trucks)
-
More may be required for crane trucks or powerline clearance
✔ Access Surface
-
Hard, compact ground
-
No soft soil
-
Avoid steep slopes
-
Gravel, concrete, compact dirt is acceptable
✔ Obstacles to Avoid
-
Low powerlines
-
Tree branches
-
Fences near driveway
-
Sharp turns
-
Narrow gates
2. Ground Level Requirements
Your site must be level before delivery.
✔ Level the area where the container will sit
-
Maximum height difference: less than 50mm
-
No dips, holes or soft patches
✔ Recommended Base Options
-
Concrete footings
-
Steel piers
-
Concrete slab
-
Levelled gravel pad
(We can show you which option suits your land during your consultation.)
3.Drainage Requirements
Water management is important for long-term durability.
✔ Ensure proper drainage around the site
-
No pooling water
-
Land should slope slightly away from the home
-
Add gravel or drainage channels if needed
✔ Keeping underside dry prevents:
-
Rust
-
Mould
-
Movement of the footings
-
Moisture damage
4.Delivery Requirements Checklist
our checklist before delivery day:
Access & Space
✔ 3.2m access width
✔ 4.0m height clearance
✔ Driveway can handle truck weight
✔ No overhanging branches or powerlines
✔ Clear path to site location
Site Preparation
✔ Ground levelled
✔ Footings or slab ready
✔ Drainage checked
✔ No obstacles in placement area
✔ Peg out the exact home position
Utilities
✔ Plumber booked (if connecting water/sewer)
✔ Electrician booked (for mains connection)
✔ Site ready for hot water system (if applicable)
Delivery Day
✔ Someone is present to guide installers
✔ Payment for crane (if applicable) organised
✔ Access gate unlocked
5. Footings & Placement Guide (Simple for Buyers)
Your container home must sit on a stable foundation.
Recommended Footing Layout
-
6 to 12 footings depending on model
-
Concrete blocks or steel piers
-
400mm x 400mm recommended size
-
Minimum depth: 300mm (varies by soil type)
Installer will:
-
Position home on footings
-
Check level
-
Ensure even weight distribution
6. Weather Considerations
Deliveries may be delayed if:
-
Heavy rain
-
Muddy ground
-
Unsafe crane conditions
-
Storms
-
Strong winds
Your safety and the home’s safety always come first.
7. After Delivery
Once placed, your tradespeople will connect:
✔ Water
✔ Sewer
✔ Electricity
✔ Gas (optional)
✔ AC split system (optional)
We provide instructions + diagrams for your electrician & plumber.